Back to homepage

CorPower S3 delivers first power to the grid

09.06.2017

Following successful system commissioning, the dry test program of the latest generation resonant Wave Energy Converter (WEC) – CorPower S3 – has started. The first power was delivered to the Swedish grid in April 2017, with the WEC operating in simulated waves using a 500kW Hardware-In-the-Loop (HIL) test rig in CorPower’s integration facility in Stockholm.

The rigorous dry test program has been designed to accelerate the product development and de-risk the upcoming ocean demonstration. The HIL-rig is used to supply the device with mechanical loading representing the full range of sea states, allowing debugging and stabilizing the system in simulated waves, including storm conditions.

Download the full press release